Monday, August 17, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

£85m Faryners House Scheme Set for Summer Start in the City

£85m Faryners House Scheme Set for Summer Start in the City
Share on FacebookShare on Twitter

Work is expected to begin this summer on an £85m plan to redevelop a 1970s office block at 25 Monument Street, on the historic site where the Great Fire of London is believed to have started, after the project secured full planning permission last month.

Designed by Fletcher Priest Architects, the proposals for Faryners House were granted a resolution to approve consent last summer, with full planning formally awarded 12 days ago. Bids for the demolition package were issued last week, with a contractor expected to be appointed shortly. Firms understood to be in contention include Erith Group, John F Hunt, Morrisroe and Deconstruct UK, ahead of a planned summer start on site.

The development was initially overseen by M3 Consulting before being taken over by Monument Estates, a vehicle established by former Aviva head of development Neal Pickering.

Pickering said: “Securing planning permission represents a significant milestone for Faryners House. The scheme has been carefully developed to maximise both architectural quality and commercial performance. We are preparing to commence works on site and bringing forward a best-in-class office building for the City.”

Faryners House takes its name from Thomas Farriner, whose bakery on Pudding Lane is widely recognised as the origin of the Great Fire of London in September 1666, which destroyed much of the City.

The design seeks to enhance the setting of the nearby The Monument to the Great Fire of London, constructed in the 1670s to commemorate the fire, while partially reinstating the historic piazza that once surrounded it.

The redevelopment will deliver approximately 97,000 sq ft of office space arranged over 10 upper floors, with several levels featuring external terraces. The cube-shaped building will extend from Pudding Lane and step down towards the elevation facing the Monument. Construction is scheduled to complete by spring 2029. The wider project team includes cost consultant Exigere, project manager Blackburn & Co, and structural engineer London Structures Lab.

Next Post
Green Light for Nature Park at Former Royal Liverpool Hospital Site

Green Light for Nature Park at Former Royal Liverpool Hospital Site

Recommended

Willmott Dixon Lands £61m Contract to Rebuild Wallasey Secondary School

Willmott Dixon Lands £61m Contract to Rebuild Wallasey Secondary School

£4m Government R&D Drive Targets 10% Cut in Build Costs

Popular News

  • Grayson Among First UK Construction Suppliers to Achieve ISO 14068 Carbon Neutrality

    Grayson Among First UK Construction Suppliers to Achieve ISO 14068 Carbon Neutrality

    0 shares
    Share 0 Tweet 0
  • Costain selected to upgrade Thames Water treatment sites

    0 shares
    Share 0 Tweet 0
  • Rioja Estates and Willmott Dixon Developments Submit Planning Application For Quayside, A £150m Mixed‑Use Development At North Quay, Great Yarmouth

    0 shares
    Share 0 Tweet 0
  • Morson Praxis triples framework presence within the Nuclear industry

    0 shares
    Share 0 Tweet 0
  • Engineering masterclass sees cables drilled underneath railway – while trains run above

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence