Sunday, July 26, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Faraday House set for revival as part of Crescent masterplan

Share on FacebookShare on Twitter

A long-vacant University of Salford building is poised for a return to active use after plans were lodged to refurbish Faraday House as part of the £2.5bn Crescent Salford masterplan. Development partnership ECF has submitted proposals alongside Salford City Council and the University of Salford to transform the building on the A6 next to Irwell Place Car Park.

The proposals sit within the wider 240-acre Crescent Salford regeneration programme, a long-term initiative reshaping this section of the city through a mix of education, residential, commercial and public realm investment.

Originally constructed as the headquarters of the Amalgamated Union of Engineering Workers before becoming part of the university estate in the 1970s, Faraday House has remained empty for several years. Under the submitted plans, the structure would be retained and comprehensively refurbished to provide 3,500 sq m of flexible workspace for the university’s professional services teams.

The scheme forms the next phase of the university’s Campus Connectivity Plan, which is focused on modernising research, teaching and public-facing facilities while improving integration across the campus estate. The intention is to repurpose the existing building fabric rather than pursue demolition and rebuild, aligning with broader sustainability objectives within the regeneration programme.

Design proposals prepared by PRP, with interior design by OBI and landscape input from Planit, outline a reconfigured internal layout designed to support collaborative and adaptable working practices. The refurbishment would introduce upgraded building services, improved accessibility and enhanced environmental performance.

Externally, the scheme includes new green space, cycle storage provision and the creation of an accessible entrance, intended to deliver a more inclusive and welcoming working environment. The landscaping strategy seeks to strengthen connections between the building and surrounding public realm, reinforcing the broader objectives of the Crescent regeneration framework.

If planning approval is granted, works are scheduled to commence before the summer, with completion targeted for winter 2027. The project represents a further step in the phased redevelopment of the Crescent area, bringing a dormant asset back into productive use while supporting the University of Salford’s evolving operational requirements.

Next Post

Carey Group delivers third year of recovery with 3.5% margin

Recommended

Building a Strong Safety Culture on Major Projects

Petrol-powered outdoor equipment is putting workers and the public at risk, new MILWAUKEE® research reveals

Petrol-powered outdoor equipment is putting workers and the public at risk, new MILWAUKEE® research reveals

Popular News

  • New Steel Tariffs Leave UK Businesses with Little Time to Prepare, Warns Cleveland Containers 

    New Steel Tariffs Leave UK Businesses with Little Time to Prepare, Warns Cleveland Containers 

    0 shares
    Share 0 Tweet 0
  • ARMAC AND THE HILL GROUP DELIVER LASTING COMMUNITY IMPACT AT COVENTRY ADULT EDUCATION CENTRE

    0 shares
    Share 0 Tweet 0
  • NatWest appoints Ashleigh Dorrington-Harvey as Head of Manufacturing and Construction

    0 shares
    Share 0 Tweet 0
  • Construction Begins on £50m Salisbury Plain Barracks Upgrades

    0 shares
    Share 0 Tweet 0
  • Second Promotion in a Year for Former Trainee

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence