Saturday, November 14, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

GRAHAM signs £286m contract to deliver Cambridge Halls redevelopment

GRAHAM signs £286m contract to deliver Cambridge Halls redevelopment
Share on FacebookShare on Twitter

GRAHAM has been appointed as contractor to deliver the redevelopment of Cambridge Halls student accommodation at Manchester Metropolitan University, which is being delivered through a joint venture between the University and Unite Students. The long-term partnership will create 2,302 new student bedrooms as part of a major regeneration of the campus.

The project includes the demolition of the existing 1990s-era accommodation and the construction of two new multi-storey buildings across two phases, providing a mix of cluster apartments and studios alongside internal and external amenity spaces. The development will also include ground-floor commercial space and a new community health centre fronting Cambridge Street, strengthening links between the campus and the surrounding community.

Designed by Cartwright Pickard architects, the buildings will rise to up to 30 storeys and deliver high-quality, purpose-built accommodation.

Designed to achieve a BREEAM ‘Excellent’ rating, the buildings will incorporate a highly thermally efficient fabric with a wide suite of low‑carbon and energy‑efficient technologies. Air‑source heat pumps, photovoltaic panels, low-energy heat‑recovery ventilation systems and advanced intelligent building management systems will all work together to substantially reduce operational energy use and carbon emissions.

Stephen Van den Hoek, Regional Director at GRAHAM, said: “Cambridge Halls is a significant and complex regeneration project that will transform this part of the campus. We are proud to have been appointed to work with Manchester Metropolitan University and Unite Students to deliver high-quality, sustainable accommodation that supports student wellbeing and long-term performance. Our team is looking forward to working collaboratively with all partners as the scheme moves forward.”

Demolition is now under way, with construction scheduled to start later this year, with phase one due for completion in 2029 and phase two following in 2030.

Next Post
Winvic establishes Data Centres as fourth core sector

Winvic establishes Data Centres as fourth core sector

Recommended

The Noble Consultancy Secures Approval for 450-home Barratt Redrow Scheme in Gillingham

The Noble Consultancy Secures Approval for 450-home Barratt Redrow Scheme in Gillingham

Key Construction and Engineering Hires in November 2025

Popular News

  • McLaren exits £280m Cardiff Arena project

    McLaren exits £280m Cardiff Arena project

    0 shares
    Share 0 Tweet 0
  • Gary Neville unveils plans for two more Manchester towers

    0 shares
    Share 0 Tweet 0
  • Kier secures planning approval for two Birmingham towers

    0 shares
    Share 0 Tweet 0
  • Direct Tool & Plant Hire expands fleet with five new Bobcat mini excavators

    0 shares
    Share 0 Tweet 0
  • Laing O’Rourke seeks buyer for Middle East business

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence