Tuesday, October 6, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Watkin Jones clears Gateway 2 for Bristol student scheme

Share on FacebookShare on Twitter

Watkin Jones has secured Gateway 2 approval for a 201-bed purpose-built student accommodation (PBSA) scheme in Bristol, enabling construction to proceed at the Freestone Road site.

The £60m development is being delivered on behalf of a joint venture between Moorfield Group and Tiger Developments. The scheme is targeting EPC A and BREEAM Excellent standards, incorporating photovoltaic panels and a connection to a district heating network as part of its sustainability strategy.

Known as Freestone Yards, the project will regenerate a brownfield site in the Temple Quarter area of Bristol. The plans comprise four blocks delivering a mix of 65 en-suite cluster flats and 136 self-contained studios. The development is designed to meet modern operational and environmental performance benchmarks, with a BREEAM Excellent rating targeted at completion.

Managing director Gwyn Pritchard said: “Achieving Gateway 2 approval for our PBSA scheme on Freestone Road demonstrates our expertise in driving projects forward while maintaining our focus on excellence in construction delivery.”

Gateway 2 approval, introduced under the Building Safety Act for higher-risk buildings, represents a critical regulatory milestone, confirming that the detailed design satisfies building safety requirements before construction advances.

The Bristol scheme adds to Moorfield’s expanding student accommodation portfolio. Through its Domain operating platform, the investor has delivered around 5,000 student beds, with a further 2,000-plus beds currently being assembled as part of its wider student housing strategy.

With Gateway 2 clearance secured, Freestone Yards now moves into the construction phase, contributing to continued regeneration activity within Bristol’s Temple Quarter and reinforcing investor appetite for high-quality, sustainability-led PBSA assets.

Next Post
Major industry leaders join DataScope in shining spotlight on construction health and safety

Major industry leaders join DataScope in shining spotlight on construction health and safety

Recommended

Mears wins £450m Birmingham council housing maintenance contract

Five Contractors Secure £1.2bn National Grid Overhead Line Programme

National Grid names 31 suppliers on £600M substation civils framework

Popular News

  • Kingston Through Their Eyes: Young Local Artists Celebrated as Competition Winners Are Announced

    Kingston Through Their Eyes: Young Local Artists Celebrated as Competition Winners Are Announced

    0 shares
    Share 0 Tweet 0
  • Paragon Bank funds Bath city centre office-to-residential conversion with £3.8 million development finance facility

    0 shares
    Share 0 Tweet 0
  • G F Tomlinson completes refurbishment of Chesterfield’s historic Stephenson Memorial Hall

    0 shares
    Share 0 Tweet 0
  • Phase 1 Enabling Works Complete at 54-Acre Teeslink Logistics Development

    0 shares
    Share 0 Tweet 0
  • Considerate Constructors Scheme launches Pathway and Supply Chain Partner types to strengthen industry collaboration

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence