Sunday, July 19, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Watkin Jones clears Gateway 2 for Bristol student scheme

Share on FacebookShare on Twitter

Watkin Jones has secured Gateway 2 approval for a 201-bed purpose-built student accommodation (PBSA) scheme in Bristol, enabling construction to proceed at the Freestone Road site.

The £60m development is being delivered on behalf of a joint venture between Moorfield Group and Tiger Developments. The scheme is targeting EPC A and BREEAM Excellent standards, incorporating photovoltaic panels and a connection to a district heating network as part of its sustainability strategy.

Known as Freestone Yards, the project will regenerate a brownfield site in the Temple Quarter area of Bristol. The plans comprise four blocks delivering a mix of 65 en-suite cluster flats and 136 self-contained studios. The development is designed to meet modern operational and environmental performance benchmarks, with a BREEAM Excellent rating targeted at completion.

Managing director Gwyn Pritchard said: “Achieving Gateway 2 approval for our PBSA scheme on Freestone Road demonstrates our expertise in driving projects forward while maintaining our focus on excellence in construction delivery.”

Gateway 2 approval, introduced under the Building Safety Act for higher-risk buildings, represents a critical regulatory milestone, confirming that the detailed design satisfies building safety requirements before construction advances.

The Bristol scheme adds to Moorfield’s expanding student accommodation portfolio. Through its Domain operating platform, the investor has delivered around 5,000 student beds, with a further 2,000-plus beds currently being assembled as part of its wider student housing strategy.

With Gateway 2 clearance secured, Freestone Yards now moves into the construction phase, contributing to continued regeneration activity within Bristol’s Temple Quarter and reinforcing investor appetite for high-quality, sustainability-led PBSA assets.

Next Post
Major industry leaders join DataScope in shining spotlight on construction health and safety

Major industry leaders join DataScope in shining spotlight on construction health and safety

Recommended

FM Conway Secures £1.25bn Westminster Highways Contract

FM Conway Secures £1.25bn Westminster Highways Contract

Graham Secures Role on 960-Bed University of Bath Accommodation Scheme

Graham Secures Role on 960-Bed University of Bath Accommodation Scheme

Popular News

  • MOD Unveils £26bn Project Royal Oak to Transform UK Naval Bases

    MOD Unveils £26bn Project Royal Oak to Transform UK Naval Bases

    0 shares
    Share 0 Tweet 0
  • Approval Granted for Second Phase of 1,600-Home Holbeche Place Regeneration in Solihull

    0 shares
    Share 0 Tweet 0
  • Birmingham City University Develops Automation Tools to Accelerate Structural Engineering Checks

    0 shares
    Share 0 Tweet 0
  • HS2 Completes Structural Works on Burton Green Tunnel

    0 shares
    Share 0 Tweet 0
  • Europe’s Largest Tunnel Boring Machine Ordered for Lower Thames Crossing

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence