Sunday, July 19, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Kier secures £44m of AMP8 early-stage work from Southern Water

Share on FacebookShare on Twitter

Kier has strengthened its position in the UK water sector with two new early contractor involvement (ECI) packages from Southern Water, together worth £44m. The latest awards build on £29m of similar AMP8 wins the contractor secured earlier in the year.

The first package, valued at £20m, covers early-stage design and development at six wastewater treatment works: Chickenhall, Fullerton, Leeds, Newnham Valley, Paddock Wood and Sellindge. The programme focuses on increasing treatment capacity and improving compliance as Southern Water advances its Water Industry National Environment Programme (WINEP) commitments.

A second tranche, worth £24.5m, spans another six sites at Dambridge, Felbridge, Staplehurst, Ticehurst, Tonbridge and Ulcombe. Kier’s scope includes developing solutions to enhance ammonia, phosphorus and biochemical oxygen demand (BOD) removal, alongside detailed constructability input to reduce risk in later delivery stages.

Both ECI deals are being delivered under NEC4 contracts, with an emphasis on securing programme certainty ahead of the main construction phases. Kier framework director Andy Beech said the awards mark “another important step” in the firm’s partnership with Southern Water at the outset of AMP8.

The new work further consolidates Kier’s growing AMP8 portfolio, following recent framework and project successes with Yorkshire Water, Wessex Water, United Utilities, Anglian Water and Severn Trent. The contractor is positioning its water business to capture a significant share of the sector’s upcoming capital investment cycle.

Next Post

Amey Rail Maintenance Staff to Vote on Strike Action

Recommended

Building a Strong Safety Culture on Major Projects

Heidelberg Materials completes road resurfacing in Cheddar Gorge

Heidelberg Materials completes road resurfacing in Cheddar Gorge

Popular News

  • MOD Unveils £26bn Project Royal Oak to Transform UK Naval Bases

    MOD Unveils £26bn Project Royal Oak to Transform UK Naval Bases

    0 shares
    Share 0 Tweet 0
  • Approval Granted for Second Phase of 1,600-Home Holbeche Place Regeneration in Solihull

    0 shares
    Share 0 Tweet 0
  • Birmingham City University Develops Automation Tools to Accelerate Structural Engineering Checks

    0 shares
    Share 0 Tweet 0
  • HS2 Completes Structural Works on Burton Green Tunnel

    0 shares
    Share 0 Tweet 0
  • Europe’s Largest Tunnel Boring Machine Ordered for Lower Thames Crossing

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence