Saturday, September 12, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Developer brands Walsall green belt ‘grey’ at inquiry

Share on FacebookShare on Twitter

A housing developer has told a planning inquiry that part of Walsall’s green belt is effectively ‘grey belt’, accusing the local authority of a ‘catastrophic’ failure to plan for new homes.

The comments were made during evidence to an examination of Walsall Council’s planning policies, where the developer argued that the authority has not identified enough suitable land to meet housing demand. They claimed that some green belt sites around the borough are already so affected by surrounding development and infrastructure that they no longer function as true open countryside.

The inquiry is considering whether Walsall’s approach to protecting green belt land is compatible with national planning policy while still delivering required housing numbers. The developer’s team argued that reclassifying and releasing selected ‘grey’ green belt sites would be necessary to avoid worsening shortages and to provide a realistic pipeline of development land.

Council representatives defended their strategy, maintaining that green belt boundaries should remain tightly drawn and that brownfield regeneration remains the priority. The inspector’s findings will be closely watched by housebuilders and planners, as they could influence how far authorities in the West Midlands can rely on green belt protection while attempting to meet housing targets.

Next Post

Seven Appliances Tackle Blaze at Cruden Glasgow Site

Recommended

New £35 million regeneration scheme launches in North Halifax

New £35 million regeneration scheme launches in North Halifax

ALTRAD RMD KWIKFORM LAUNCHES THE R800 FOOTBRIDGE FOR IMPROVED TEMPORARY ACCESS

ALTRAD RMD KWIKFORM LAUNCHES THE R800 FOOTBRIDGE FOR IMPROVED TEMPORARY ACCESS

Popular News

  • Berkeley calls for urgent stamp duty reform in Budget

    Berkeley calls for urgent stamp duty reform in Budget

    0 shares
    Share 0 Tweet 0
  • NI Water launches procurement for £10.5bn works framework

    0 shares
    Share 0 Tweet 0
  • McLaren set for timber-frame office and 1,014 homes at York Central

    0 shares
    Share 0 Tweet 0
  • Infrastructure demand drives record results at Clancy

    0 shares
    Share 0 Tweet 0
  • BT Tower to become hotel

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence