Saturday, April 4, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

GRAHAM signs £286m contract to deliver Cambridge Halls redevelopment

GRAHAM signs £286m contract to deliver Cambridge Halls redevelopment
Share on FacebookShare on Twitter

GRAHAM has been appointed as contractor to deliver the redevelopment of Cambridge Halls student accommodation at Manchester Metropolitan University, which is being delivered through a joint venture between the University and Unite Students. The long-term partnership will create 2,302 new student bedrooms as part of a major regeneration of the campus.

The project includes the demolition of the existing 1990s-era accommodation and the construction of two new multi-storey buildings across two phases, providing a mix of cluster apartments and studios alongside internal and external amenity spaces. The development will also include ground-floor commercial space and a new community health centre fronting Cambridge Street, strengthening links between the campus and the surrounding community.

Designed by Cartwright Pickard architects, the buildings will rise to up to 30 storeys and deliver high-quality, purpose-built accommodation.

Designed to achieve a BREEAM ‘Excellent’ rating, the buildings will incorporate a highly thermally efficient fabric with a wide suite of low‑carbon and energy‑efficient technologies. Air‑source heat pumps, photovoltaic panels, low-energy heat‑recovery ventilation systems and advanced intelligent building management systems will all work together to substantially reduce operational energy use and carbon emissions.

Stephen Van den Hoek, Regional Director at GRAHAM, said: “Cambridge Halls is a significant and complex regeneration project that will transform this part of the campus. We are proud to have been appointed to work with Manchester Metropolitan University and Unite Students to deliver high-quality, sustainable accommodation that supports student wellbeing and long-term performance. Our team is looking forward to working collaboratively with all partners as the scheme moves forward.”

Demolition is now under way, with construction scheduled to start later this year, with phase one due for completion in 2029 and phase two following in 2030.

Next Post
Winvic establishes Data Centres as fourth core sector

Winvic establishes Data Centres as fourth core sector

Recommended

Bouygues Secures Approval for Major LSE Student Tower Scheme in London

UK Enters Next Phase of Nuclear Decommissioning with Hunterston B Transfer

AWARD-WINNING HOUSEBUILDER GIFTS EIGHT HOMES TO COMBAT HOMELESSNESS IN SOUTHWARK

AWARD-WINNING HOUSEBUILDER GIFTS EIGHT HOMES TO COMBAT HOMELESSNESS IN SOUTHWARK

Popular News

  • Tustin Estate’s Next Chapter: Bouygues UK Signs Contract to Deliver 284 New Homes for Southwark Residents as Phase 2 Progresses

    Tustin Estate’s Next Chapter: Bouygues UK Signs Contract to Deliver 284 New Homes for Southwark Residents as Phase 2 Progresses

    0 shares
    Share 0 Tweet 0
  • Introducing Hartmere: The Hill Group reveals its latest Cambridge community

    0 shares
    Share 0 Tweet 0
  • Why One Triaxial Test Result Is Never Enough

    0 shares
    Share 0 Tweet 0
  • ASWS wins contract at Glasshouse Street

    0 shares
    Share 0 Tweet 0
  • Three jailed over CSCS test fraud using Bluetooth earpieces

    0 shares
    Share 0 Tweet 0

Connect with us

Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence