Thursday, November 19, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Amazon’s first net-zero carbon delivery station in the UK launched in Stockton-on-Tees

Amazon’s first net-zero carbon delivery station in the UK launched in Stockton-on-Tees

UNP Amazon 48381 DZM1 Teeside Amazon site lead Alex Hallimond ©UNP John Millard www.unp.co.uk 0845 600 7737 pictures@unp.co.uk

Share on FacebookShare on Twitter

Amazon has opened a £40 million delivery station in Stockton-on-Tees – a local warehouse where packages are prepared for delivery to customers’ doors – the first building in its global network to pursue the latest version of the Living Future Institute’s (ILFI) Zero Carbon Certification. Constructed to the UK Net Zero Carbon Buildings Standard, the new facility sets a benchmark for lower-carbon logistics buildings across the UK and Europe.

Creating jobs and investing in the region

The delivery station has now created 100 jobs in the local area, including managers, supervisors, and associates. All full-time operations positions offer competitive pay starting at more than £31,000 a year, alongside a comprehensive benefits package including private medical insurance, life assurance, income protection, employee discounts, and pension plan.

Since 2010, Amazon has invested more than £4.7 billion in the North East, opening employment pathways for the local community. At the Stockton-on-Tees fulfilment centre alone, independent research by Public First found that nearly half (48%) of entry-level employees were previously unemployed or came straight from education when they joined the site, which opened in 2022.

Part of Amazon’s biggest ever UK investment

Alex Hallimond, Amazon’s Senior Operations Manager at the Stockton-on-Tees delivery station, said: ” The North East has a proud industrial heritage as one of the UK’s great manufacturing regions. That tradition of building things continues with this new delivery station, setting a new sustainability blueprint that could shape how we design sites in the UK around the world.”

The delivery station is part of Amazon’s commitment to invest £40 billion in the UK between 2025 and 2027 – the largest investment in the company’s history outside the US – funding jobs, infrastructure, and technology across the country. Amazon’s investments in carbon-free energy, transport electrification, and sustainable packaging in the UK total £3.5 billion over the past five years, supporting up to 34,000 jobs and generating billions more in economic value, according to an independent study by Frontier Economics.

Cutting construction carbon by at least 20%

The Stockton-on-Tees delivery station was designed to tackle emissions at every stage, from the materials used in construction to the energy that powers daily operations.

The building and parking structure uses almost 1,500 tonnes of lower-carbon steel with high recycled content, produced using renewable electricity. More than 200 tonnes of mass timber beams complement the steel structure, reducing the carbon footprint of traditional building methods. More than 4,400m³ of lower-carbon concrete, alongside lower-carbon wall panels and roofing materials, round out a construction approach that prioritises locally sourced supplies and shorter supply chains. By combining these materials and practices, total carbon emissions associated with the construction are at least 20% lower than Amazon’s previous design standards.

The station’s all-electric systems and rooftop solar panels are designed to work together to minimise the building’s operational carbon footprint. The site is projected to use around half the energy of a typical logistics building. Water-saving plumbing fixtures are also set to reduce water consumption by approximately 20% compared to conventional designs.

Next Post
RoSPA Launches 2027 Health and Safety Awards to Showcase Worldwide Safety Excellence

RoSPA Launches 2027 Health and Safety Awards to Showcase Worldwide Safety Excellence

Recommended

Olympian clears Gateway 2 for UK’s tallest co-living tower

More milestones reached in the development of Heidelberg Materials’ Padeswood CCS project

More milestones reached in the development of Heidelberg Materials’ Padeswood CCS project

Popular News

  • Pasquill Welcomes Three New Appointments to Leadership Team

    Pasquill Welcomes Three New Appointments to Leadership Team

    0 shares
    Share 0 Tweet 0
  • Housebuilder Breaks Ground at £100 Million Scheme in Lincolnshire

    0 shares
    Share 0 Tweet 0
  • Plans Submitted for Birmingham’s Proposed 324m Skyscraper

    0 shares
    Share 0 Tweet 0
  • Kobelco Trials Remote Excavator Technology for Ukraine Reconstruction

    0 shares
    Share 0 Tweet 0
  • Rochdale’s Seven Sisters Towers Set for Demolition and Replacement with 600 Homes

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence