Wednesday, October 14, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Willmott Dixon starts £40m Leeds rail office overhaul

Willmott Dixon starts £40m Leeds rail office overhaul
Share on FacebookShare on Twitter

Willmott Dixon has started work on the £40m refurbishment of Princes Exchange, an eight-storey office building next to Leeds station that Network Rail is bringing back into use as a new city centre hub for the rail industry.

The 108,576 sq ft building, located opposite the Aire Street entrance to Leeds City Station, was acquired by Network Rail in 2024 after becoming vacant. The Department for Transport and Network Rail-funded project is being delivered by Network Rail and its property development arm Platform4, working with Willmott Dixon.

The redevelopment will create dedicated accommodation for Network Rail and other rail industry organisations alongside commercial office space. Three floors will be occupied by Network Rail and other rail organisations, bringing track and train teams together within a single location.

The remaining five floors will be refurbished and fitted out for commercial letting, with space expected to become available from mid-2027.

The construction programme includes replacing all of the building’s windows and its roof, alongside refurbishment of the main entrance and facade. Improvements will also be made to the public realm surrounding the building, helping to enhance the area immediately outside the station and office development.

Energy efficiency and sustainability are key elements of the redevelopment, with Network Rail also highlighting the importance of digital connectivity as part of the building’s transformation into a modern workplace.

Princes Exchange’s location directly opposite Leeds City Station provides rail staff with direct access to the city’s main railway hub, while the commercial office space will add further employment capacity within Leeds city centre.

The project is scheduled for completion in June 2027, with the commercial floors expected to be ready for occupation from the middle of that year.

Next Post
New Plans for Beechmere, but the Sprinkler Gap Still Isn’t Closed

New Plans for Beechmere, but the Sprinkler Gap Still Isn't Closed

Recommended

Castle Green Homes appointed to Homes England DPS

Castle Green Homes appointed to Homes England DPS

The hidden carbon cost of infrastructure loss

The hidden carbon cost of infrastructure loss

Popular News

  • Silbury House Achieves 5-Star NABERS UK Rating for Operational Performance

    Silbury House Achieves 5-Star NABERS UK Rating for Operational Performance

    0 shares
    Share 0 Tweet 0
  • CITB’s New Entrant Support Team Celebrates Over 13,500 Apprenticeship Starts

    0 shares
    Share 0 Tweet 0
  • City Centre South Reaches Major Milestone as First Tower Begins to Rise

    0 shares
    Share 0 Tweet 0
  • Heart of Worcestershire College calls on local construction employers to invest in the next generation of apprentices

    0 shares
    Share 0 Tweet 0
  • Underground telecom network could help Southern Water locate leaks faster

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence