Sunday, November 22, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Hochiki Europe’s open protocol system protects prestigious Oxford Street building

Hochiki Europe’s open protocol system protects prestigious Oxford Street building
Share on FacebookShare on Twitter

Hochiki Europe has completed a new fire detection system at 334 Oxford Street, a mixed-use retail and office development on one of Europe’s busiest shopping streets. Hall & Kay Fire installed the system, which is based on Hochiki’s ESP open protocol. It protects 11 storeys and a site capacity of 7,915 occupants.

The installation had to be completed within a tight programme while fire protection was maintained across the building’s basement, ground floor and nine upper floors. Hochiki’s electronics-free YBN-R/3 common mounting base accepts the majority of the ESP range, which helped Hall & Kay cut cabling time and stay on schedule. Where cabling would have affected the finished interior, Hochiki’s hybrid wireless system was installed. It connects to the ESP loop and forms a self-configuring mesh network, routing each signal through the strongest available path.

“With the project having a specific deadline, we understood all the requirements needed to deliver a fully functional fire system on the site,” said Rikki Farrah, Project Manager at Hall & Kay Fire. “Hochiki’s systems simplified installation and reduced downtime, which enabled more time for testing.”

The ESP open protocol allows Hochiki addressable products and a wide range of third-party devices to share the same loop, which helps keep maintenance costs down. Each device reports its precise location when activated, so building management can identify the device in alarm on any floor and respond quickly. All devices were installed in white to suit the building’s interior and keep detection discreet.

Nine networked Latitude panels with graphics software monitor the whole system. Latitude is certified to EN 54-2, EN 54-4 and EN 54-13, which met the end user’s requirement for full standards compliance. Its plug and play peripherals, such as relay cards and repeater panels, allow the system to be extended as the building’s retail and office spaces grow.

Neil Eves, Head of Major Projects and Specifications at Hochiki Europe, said: “This prestigious building demanded the highest level of protection, and its new integrated open protocol system will ensure the building is future proofed for years to come and fully upgradable as the building’s retail and office spaces expand.”

Next Post
SkillBuild 2026 National Final to showcase next generation of construction talent

SkillBuild 2026 National Final to showcase next generation of construction talent

Recommended

ALTRAD RMD KWIKFORM SUPPORTS CONSTRUCTION OF NEW WEAR FOOTBRIDGE IN SUNDERLAND

ALTRAD RMD KWIKFORM SUPPORTS CONSTRUCTION OF NEW WEAR FOOTBRIDGE IN SUNDERLAND

Conlon Construction transforms historic Crewe Municipal Buildings into modern workspace

Conlon Construction transforms historic Crewe Municipal Buildings into modern workspace

Popular News

  • Kier promotes Rebecca Boundy to group clients and markets director

    Kier promotes Rebecca Boundy to group clients and markets director

    0 shares
    Share 0 Tweet 0
  • Sisk secures £37m contract for Birkenhead Borough Yard regeneration

    0 shares
    Share 0 Tweet 0
  • Thames Water submits planning application for White Horse Reservoir

    0 shares
    Share 0 Tweet 0
  • Caterpillar makes collision warning technology standard on new machines

    0 shares
    Share 0 Tweet 0
  • AtkinsRéalis appointed to manage next stages of Cardiff Crossrail

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence