Sunday, July 26, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

MTX wins £33m modular hospital contract at Royal Alexandra in Rhyl

Share on FacebookShare on Twitter

MTX Contracts has been appointed to deliver the £33m transformation of the historic Royal Alexandra Hospital in Rhyl, North Wales.

The main design and build contract, awarded by Betsi Cadwaladr University Health Board, will see the contractor deliver a three-storey, 2,500m² facility using advanced elements of modern methods of construction.

MTX led the scheme through a two-stage procurement process under a pre-construction services agreement, working closely with NHS Wales Shared Services Partnership to develop a fully compliant design to RIBA Stage 4.

The contractor also worked closely with the health board during a series of carefully planned end-user sessions aimed at engaging the various departments that will operate within the new building.

Precisely engineered steel structural units will form the core fabric of the facility, with modules manufactured offsite while groundworks take place on site in order to streamline the overall construction programme.

Once the foundations and site preparations are complete, the prefabricated modules will be transported to site, craned into position and made watertight, enabling concrete floors to be poured and internal fit-out alongside the installation of mechanical and electrical services to progress quickly.

Work is expected to begin on site in the coming weeks, with completion scheduled for 2027.

The project represents the first phase of a £60m investment programme at the Royal Alexandra Hospital. A separate business case will be submitted by the health board for phase two, which will focus on redeveloping and improving the existing hospital estate.

MTX Contracts managing director David Hartley said: “Being chosen to partner with the health board in the creation of this important healthcare project reflects our strong track record in providing high-quality healthcare facilities across the UK.

“By employing hybrid methods of construction and our own unique skillset, we’re looking forward to delivering this vital new facility quickly, sustainably and cost-effectively, all whilst minimising disruption to existing patient pathways.”

Next Post

Habiko submits plans for 240-home affordable scheme in Warrington

Recommended

Keepmoat appoints new Land and Partnerships Director

Keepmoat appoints new Land and Partnerships Director

TfL Unveils Thames Tunnel Plans for DLR Extension to Thamesmead

TfL Unveils Thames Tunnel Plans for DLR Extension to Thamesmead

Popular News

  • New Steel Tariffs Leave UK Businesses with Little Time to Prepare, Warns Cleveland Containers 

    New Steel Tariffs Leave UK Businesses with Little Time to Prepare, Warns Cleveland Containers 

    0 shares
    Share 0 Tweet 0
  • ARMAC AND THE HILL GROUP DELIVER LASTING COMMUNITY IMPACT AT COVENTRY ADULT EDUCATION CENTRE

    0 shares
    Share 0 Tweet 0
  • NatWest appoints Ashleigh Dorrington-Harvey as Head of Manufacturing and Construction

    0 shares
    Share 0 Tweet 0
  • Construction Begins on £50m Salisbury Plain Barracks Upgrades

    0 shares
    Share 0 Tweet 0
  • Second Promotion in a Year for Former Trainee

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence