Friday, July 3, 2026
NEWSLETTER
Construction Intelligence
No Result
View All Result
  • News
    • Infrastructure
    • Housing
    • Safety & Wellbeing
    • Finance
    • People
    • Products
    • Architecture & Design
    • Environment
    • Awards
    • Plant & Machinery
No Result
View All Result
Construction Intelligence
No Result
View All Result

Northern Trains launches procurement for £300m depots and stations framework

Northern Trains launches procurement for £300m depots and stations framework
Share on FacebookShare on Twitter

Northern Trains is preparing to launch a £300m construction framework covering infrastructure upgrades across its network of 22 train care depots and more than 470 stations.

The framework is scheduled to commence in March 2027 and will run for an initial five-year term, with the option to extend for a further three years until 2035.

It is intended to establish a long-term supply chain capable of delivering a broad range of works, including building refurbishments, depot fit-outs, major civil engineering, mechanical and electrical installations, track, electrification and signalling projects required to support existing operations and the introduction of new rolling stock.

The framework will be divided into four specialist lots covering internal building fit-outs, access and heavy component movement, integrated multi-disciplinary rail infrastructure projects, and specialist design-and-build servicing facilities.

The largest lot will cover a wide range of disciplines, including civil engineering, buildings, permanent way, electrification, high-voltage works, signalling, telecommunications, geotechnical engineering, drainage, highways, environmental improvements, and mechanical and electrical installations.

Northern said the framework would provide a flexible delivery model capable of handling projects of varying scale and complexity.

Contractors appointed to the framework will also be expected to promote continuous improvement, innovation and enhanced whole-life asset performance across the estate.

Ahead of the formal procurement, Northern has launched an early market engagement exercise, with a virtual supplier briefing planned for 14 July.

The operator is inviting feedback from the industry on the proposed framework structure, lot packaging, pricing models, commercial terms and risk allocation before issuing the official tender documentation.

Recommended

Hygiene and acoustic standards delivered for Alhambra Centre, Barnsley

Hygiene and acoustic standards delivered for Alhambra Centre, Barnsley

HSE sets out tougher incident reporting shake-up for construction

HSE sets out tougher incident reporting shake-up for construction

Popular News

  • Northern Trains launches procurement for £300m depots and stations framework

    Northern Trains launches procurement for £300m depots and stations framework

    0 shares
    Share 0 Tweet 0
  • Laing O’Rourke joins consortium bidding for 14-reactor UK SMR programme

    0 shares
    Share 0 Tweet 0
  • The Hill Group Bucks Market Trend as Profits Rise to Record £92.5m and Revenue Hits £1.2bn

    0 shares
    Share 0 Tweet 0
  • Wyatt Homes Secures Landmark Blandford Forum Site to Deliver New Homes, Green Spaces and Community Investment

    0 shares
    Share 0 Tweet 0
  • Centenary celebration is a ‘Perfekt’ testimony to NorDan success

    0 shares
    Share 0 Tweet 0
Construction Intelligence

© 2025 Construction Intelligence

  • About
  • Advertise
  • Privacy Policy
  • Cookie Policy
  • Terms & Conditions

No Result
View All Result
  • Home

© 2025 Construction Intelligence